Georgia Power 24S-IC-1199 (24S-IC-1199)

Georgia Power 24S-IC-1199 is a 49.5 MW solar interconnection project in Lowndes County, Georgia with a current status of operational. It is proposed to connect at Mission Pond Substation 115 kV Bus.

49.5 MWCapacity
OperationalStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power 24S-IC-1199
Queue ID24S-IC-1199
Statusoperational
Source statusCommercial Operation
MarketGA
TechnologySolar
Capacity49.5 MW
StateGeorgia
CountyLowndes County
Point of interconnectionMission Pond Substation 115 kV Bus
Requested (queue) date2023-11-03
Proposed in-service date2025-11-04
Operational date2025-11-04
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata