Georgia Power 24S-IC-1222 (24S-IC-1222)

Georgia Power 24S-IC-1222 is a 250.0 MW battery interconnection project in Bartow County, Georgia with a current status of active. It is proposed to connect at Bowen - Judy Mountain 230 kV Line.

250.0 MWCapacity
ActiveStatus
GAMarket
BatteryTechnology

Project facts

Canonical nameGeorgia Power 24S-IC-1222
Queue ID24S-IC-1222
Statusactive
Source statusGIA with NTP
MarketGA
TechnologyBattery
Capacity250.0 MW
StateGeorgia
CountyBartow County
Point of interconnectionBowen - Judy Mountain 230 kV Line
Requested (queue) date2023-12-19
Proposed in-service date2027-06-14
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.