Georgia Power 25-IC-1313 (25-IC-1313)

Georgia Power 25-IC-1313 is a 500.0 MW battery interconnection project in Bartow County, Georgia with a current status of active. It is proposed to connect at Bowen - Judy Mountain 230 kV Line.

500.0 MWCapacity
ActiveStatus
GAMarket
BatteryTechnology

Project facts

Canonical nameGeorgia Power 25-IC-1313
Queue ID25-IC-1313
Statusactive
Source statusGIA Draft
MarketGA
TechnologyBattery
Capacity500.0 MW
StateGeorgia
CountyBartow County
Point of interconnectionBowen - Judy Mountain 230 kV Line
Requested (queue) date2025-04-08
Proposed in-service date2028-08-24
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata