Georgia Power 25-IC-1314 (25-IC-1314)

Georgia Power 25-IC-1314 is a 250.0 MW battery interconnection project in Floyd County, Georgia with a current status of active. It is proposed to connect at Hammond SP Substation 230 kV Bus.

250.0 MWCapacity
ActiveStatus
GAMarket
BatteryTechnology

Project facts

Canonical nameGeorgia Power 25-IC-1314
Queue ID25-IC-1314
Statusactive
Source statusGIA Draft
MarketGA
TechnologyBattery
Capacity250.0 MW
StateGeorgia
CountyFloyd County
Point of interconnectionHammond SP Substation 230 kV Bus
Requested (queue) date2025-04-08
Proposed in-service date2028-08-24
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata