Georgia Power 25-IC-1324 (25-IC-1324)

Georgia Power 25-IC-1324 is a 120.0 MW solar interconnection project in Dodge County, Georgia with a current status of active. It is proposed to connect at Bonaire Primary - Eastman Primary 115 kV Line.

120.0 MWCapacity
ActiveStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power 25-IC-1324
Queue ID25-IC-1324
Statusactive
Source statusGIA Draft
MarketGA
TechnologySolar
Capacity120.0 MW
StateGeorgia
CountyDodge County
Point of interconnectionBonaire Primary - Eastman Primary 115 kV Line
Requested (queue) date2025-04-11
Proposed in-service date2029-08-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—activehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-11-26

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata