Georgia Power 25-IC-1333A (25-IC-1333A)

Georgia Power 25-IC-1333A is a 715.0 MW gas interconnection project in Heard County, Georgia with a current status of active. It is proposed to connect at Wansley CC Substation 500 kV Bus.

715.0 MWCapacity
ActiveStatus
GAMarket
GasTechnology

Project facts

Canonical nameGeorgia Power 25-IC-1333A
Queue ID25-IC-1333A
Statusactive
Source statusGIA Draft
MarketGA
TechnologyGas
Capacity715.0 MW
StateGeorgia
CountyHeard County
Point of interconnectionWansley CC Substation 500 kV Bus
Requested (queue) date2025-04-11
Proposed in-service date2031-10-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—activehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-11-26

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.