Georgia Power 25-IC-1334 (25-IC-1334)

Georgia Power 25-IC-1334 is a 250.0 MW battery interconnection project in Effingham County, Georgia with a current status of active. It is proposed to connect at McIntosh Substation 115 kV Bus.

250.0 MWCapacity
ActiveStatus
GAMarket
BatteryTechnology

Project facts

Canonical nameGeorgia Power 25-IC-1334
Queue ID25-IC-1334
Statusactive
Source statusGIA Draft
MarketGA
TechnologyBattery
Capacity250.0 MW
StateGeorgia
CountyEffingham County
Point of interconnectionMcIntosh Substation 115 kV Bus
Requested (queue) date2025-04-11
Proposed in-service date2029-11-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata