Georgia Power 25-IC-1342 (25-IC-1342)
Georgia Power 25-IC-1342 is a 199.0 MW solar interconnection project in Laurens County, Georgia with a current status of active. It is proposed to connect at Eastman Primary - Hatch 230 kV Line.
199.0 MWCapacity
ActiveStatus
GAMarket
SolarTechnology
Project facts
| Canonical name | Georgia Power 25-IC-1342 |
|---|---|
| Queue ID | 25-IC-1342 |
| Status | active |
| Source status | GIA Draft |
| Market | GA |
| Technology | Solar |
| Capacity | 199.0 MW |
| State | Georgia |
| County | Laurens County |
| Point of interconnection | Eastman Primary - Hatch 230 kV Line |
| Requested (queue) date | 2025-04-14 |
| Proposed in-service date | 2030-03-06 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Georgia Power |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata