Georgia Power 25-IC-1373 (25-IC-1373)

Georgia Power 25-IC-1373 is a 120.0 MW solar interconnection project in Pike County, Georgia with a current status of active. It is proposed to connect at Corn Crib - Thomaston 115 kV Line.

120.0 MWCapacity
ActiveStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power 25-IC-1373
Queue ID25-IC-1373
Statusactive
Source statusGIA Draft
MarketGA
TechnologySolar
Capacity120.0 MW
StateGeorgia
CountyPike County
Point of interconnectionCorn Crib - Thomaston 115 kV Line
Requested (queue) date2025-04-17
Proposed in-service date2028-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata