Georgia Power 25-IC-1375 (25-IC-1375)

Georgia Power 25-IC-1375 is a 325.0 MW battery interconnection project in Jackson County, Georgia with a current status of active. It is proposed to connect at Center Primary - Pond Fork 230 kV Line.

325.0 MWCapacity
ActiveStatus
GAMarket
BatteryTechnology

Project facts

Canonical nameGeorgia Power 25-IC-1375
Queue ID25-IC-1375
Statusactive
Source statusGIA Draft
MarketGA
TechnologyBattery
Capacity325.0 MW
StateGeorgia
CountyJackson County
Point of interconnectionCenter Primary - Pond Fork 230 kV Line
Requested (queue) date2025-04-17
Proposed in-service date2031-07-30
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—activehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-10-12

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata