Georgia Power 25-IC-1383 (25-IC-1383)

Georgia Power 25-IC-1383 is a 199.0 MW battery interconnection project in Mitchell County, Georgia with a current status of active. It is proposed to connect at Mitchell Substation 230 kV Bus.

199.0 MWCapacity
ActiveStatus
GAMarket
BatteryTechnology

Project facts

Canonical nameGeorgia Power 25-IC-1383
Queue ID25-IC-1383
Statusactive
Source statusGIA Draft
MarketGA
TechnologyBattery
Capacity199.0 MW
StateGeorgia
CountyMitchell County
Point of interconnectionMitchell Substation 230 kV Bus
Requested (queue) date2025-04-17
Proposed in-service date2029-05-31
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.