Georgia Power 25-IC-1387 (25-IC-1387)

Georgia Power 25-IC-1387 is a 92.0 MW solar interconnection project in Sumter County, Georgia with a current status of active. It is proposed to connect at Flint Overlook Substaion 115 kV Bus.

92.0 MWCapacity
ActiveStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power 25-IC-1387
Queue ID25-IC-1387
Statusactive
Source statusGIA Draft
MarketGA
TechnologySolar
Capacity92.0 MW
StateGeorgia
CountySumter County
Point of interconnectionFlint Overlook Substaion 115 kV Bus
Requested (queue) date2025-04-17
Proposed in-service date2029-04-27
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata