Georgia Power 25-IC-AS (25-IC-AS)

Georgia Power 25-IC-AS is a 199.0 MW battery interconnection project in Hart County, Georgia with a current status of withdrawn. It is proposed to connect at Bio Substation 230 kV Bus.

199.0 MWCapacity
WithdrawnStatus
GAMarket
BatteryTechnology

Project facts

Canonical nameGeorgia Power 25-IC-AS
Queue ID25-IC-AS
Statuswithdrawn
Source statusRequest Withdrawn
MarketGA
TechnologyBattery
Capacity199.0 MW
StateGeorgia
CountyHart County
Point of interconnectionBio Substation 230 kV Bus
Requested (queue) date
Proposed in-service date2028-08-07
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.