Georgia Power 25-IC-BF (25-IC-BF)

Georgia Power 25-IC-BF is a 199.0 MW other interconnection project in Miller County, Georgia with a current status of withdrawn. It is proposed to connect at Farley (APC) - South Bainbridge 230 kV Line.

199.0 MWCapacity
WithdrawnStatus
GAMarket
OtherTechnology

Project facts

Canonical nameGeorgia Power 25-IC-BF
Queue ID25-IC-BF
Statuswithdrawn
Source statusRequest Withdrawn
MarketGA
TechnologyOther
Capacity199.0 MW
StateGeorgia
CountyMiller County
Point of interconnectionFarley (APC) - South Bainbridge 230 kV Line
Requested (queue) date—
Proposed in-service date2030-09-30
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—withdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-11-26

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata