Georgia Power 25-IC-BG (25-IC-BG)

Georgia Power 25-IC-BG is a 250.0 MW solar interconnection project in Appling County, Georgia with a current status of withdrawn. It is proposed to connect at Hatch - Union School 230 kV Line.

250.0 MWCapacity
WithdrawnStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power 25-IC-BG
Queue ID25-IC-BG
Statuswithdrawn
Source status
MarketGA
TechnologySolar
Capacity250.0 MW
StateGeorgia
CountyAppling County
Point of interconnectionHatch - Union School 230 kV Line
Requested (queue) date
Proposed in-service date
Operational date
Withdrawn date2025-04-18
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata