Georgia Power 25-SIC-013 (25-SIC-013)

Georgia Power 25-SIC-013 is a 200.0 MW solar interconnection project in Irwin County, Georgia with a current status of withdrawn. It is proposed to connect at North Tifton - Stump Creek 230 kV Line.

200.0 MWCapacity
WithdrawnStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power 25-SIC-013
Queue ID25-SIC-013
Statuswithdrawn
Source statusRequest Withdrawn
MarketGA
TechnologySolar
Capacity200.0 MW
StateGeorgia
CountyIrwin County
Point of interconnectionNorth Tifton - Stump Creek 230 kV Line
Requested (queue) date2024-01-08
Proposed in-service date2028-06-06
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.