Georgia Power 26-IC-1394 (26-IC-1394)

Georgia Power 26-IC-1394 is a 199.0 MW solar interconnection project in Greene County, Georgia with a current status of active. It is proposed to connect at Union Point Primary TS Substation 230 kV Bus.

199.0 MWCapacity
ActiveStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power 26-IC-1394
Queue ID26-IC-1394
Statusactive
Source statusCluster Study
MarketGA
TechnologySolar
Capacity199.0 MW
StateGeorgia
CountyGreene County
Point of interconnectionUnion Point Primary TS Substation 230 kV Bus
Requested (queue) date2026-03-13
Proposed in-service date2030-03-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata