Georgia Power 26-IC-1396 (26-IC-1396)

Georgia Power 26-IC-1396 is a 290.0 MW solar interconnection project in Sumter County, Georgia with a current status of active. It is proposed to connect at North Americus - Talbot County #2 230 kV Line.

290.0 MWCapacity
ActiveStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power 26-IC-1396
Queue ID26-IC-1396
Statusactive
Source statusCluster Study
MarketGA
TechnologySolar
Capacity290.0 MW
StateGeorgia
CountySumter County
Point of interconnectionNorth Americus - Talbot County #2 230 kV Line
Requested (queue) date2026-03-17
Proposed in-service date2029-11-16
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata