Georgia Power 26-IC-1420 (26-IC-1420)

Georgia Power 26-IC-1420 is a 250.0 MW battery interconnection project in Appling County, Georgia with a current status of active. It is proposed to connect at Hatch - Offerman 230 kV Line.

250.0 MWCapacity
ActiveStatus
GAMarket
BatteryTechnology

Project facts

Canonical nameGeorgia Power 26-IC-1420
Queue ID26-IC-1420
Statusactive
Source statusCluster Study
MarketGA
TechnologyBattery
Capacity250.0 MW
StateGeorgia
CountyAppling County
Point of interconnectionHatch - Offerman 230 kV Line
Requested (queue) date2026-03-23
Proposed in-service date2030-08-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata