Georgia Power 26-IC-1433 (26-IC-1433)

Georgia Power 26-IC-1433 is a 103.0 MW gas interconnection project in Douglas County, Georgia with a current status of active. It is proposed to connect at Villa Rica Primary TS Substation 115 kV Bus.

103.0 MWCapacity
ActiveStatus
GAMarket
GasTechnology

Project facts

Canonical nameGeorgia Power 26-IC-1433
Queue ID26-IC-1433
Statusactive
Source statusCluster Study
MarketGA
TechnologyGas
Capacity103.0 MW
StateGeorgia
CountyDouglas County
Point of interconnectionVilla Rica Primary TS Substation 115 kV Bus
Requested (queue) date2026-03-23
Proposed in-service date2029-10-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata