Georgia Power 26-IC-1438 (26-IC-1438)
Georgia Power 26-IC-1438 is a 200.0 MW battery interconnection project in Jackson County, Georgia with a current status of active. It is proposed to connect at Athena - Center Primary 230 kV Line.
200.0 MWCapacity
ActiveStatus
GAMarket
BatteryTechnology
Project facts
| Canonical name | Georgia Power 26-IC-1438 |
|---|---|
| Queue ID | 26-IC-1438 |
| Status | active |
| Source status | Cluster Study |
| Market | GA |
| Technology | Battery |
| Capacity | 200.0 MW |
| State | Georgia |
| County | Jackson County |
| Point of interconnection | Athena - Center Primary 230 kV Line |
| Requested (queue) date | 2026-03-24 |
| Proposed in-service date | 2030-09-02 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Georgia Power |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata