Georgia Power 26-IC-1440 (26-IC-1440)

Georgia Power 26-IC-1440 is a 200.0 MW solar interconnection project in Taylor County, Georgia with a current status of active. It is proposed to connect at Butler DS Substation 230 kV Bus.

200.0 MWCapacity
ActiveStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power 26-IC-1440
Queue ID26-IC-1440
Statusactive
Source statusCluster Study
MarketGA
TechnologySolar
Capacity200.0 MW
StateGeorgia
CountyTaylor County
Point of interconnectionButler DS Substation 230 kV Bus
Requested (queue) date2026-03-25
Proposed in-service date2028-08-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata