Georgia Power 26-IC-1451 (26-IC-1451)

Georgia Power 26-IC-1451 is a 250.0 MW battery interconnection project in Effingham County, Georgia with a current status of active. It is proposed to connect at McIntosh TS Substation 230 kV Bus.

250.0 MWCapacity
ActiveStatus
GAMarket
BatteryTechnology

Project facts

Canonical nameGeorgia Power 26-IC-1451
Queue ID26-IC-1451
Statusactive
Source statusCluster Study
MarketGA
TechnologyBattery
Capacity250.0 MW
StateGeorgia
CountyEffingham County
Point of interconnectionMcIntosh TS Substation 230 kV Bus
Requested (queue) date2026-03-26
Proposed in-service date2031-04-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata