Georgia Power 26-IC-1463 (26-IC-1463)

Georgia Power 26-IC-1463 is a 199.0 MW battery interconnection project in Johnson County, Georgia with a current status of withdrawn. It is proposed to connect at North Dublin - Wadley Primary 230 kV Line.

199.0 MWCapacity
WithdrawnStatus
GAMarket
BatteryTechnology

Project facts

Canonical nameGeorgia Power 26-IC-1463
Queue ID26-IC-1463
Statuswithdrawn
Source statusRequest Withdrawn
MarketGA
TechnologyBattery
Capacity199.0 MW
StateGeorgia
CountyJohnson County
Point of interconnectionNorth Dublin - Wadley Primary 230 kV Line
Requested (queue) date2026-04-01
Proposed in-service date2029-11-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata