Georgia Power 26-IC-1482 (26-IC-1482)

Georgia Power 26-IC-1482 is a 1,500.0 MW gas interconnection project in Mitchell County, Georgia with a current status of active. It is proposed to connect at North Tifton - Raccoon Creek 500 kV Line.

1,500.0 MWCapacity
ActiveStatus
GAMarket
GasTechnology

Project facts

Canonical nameGeorgia Power 26-IC-1482
Queue ID26-IC-1482
Statusactive
Source statusCluster Study
MarketGA
TechnologyGas
Capacity1,500.0 MW
StateGeorgia
CountyMitchell County
Point of interconnectionNorth Tifton - Raccoon Creek 500 kV Line
Requested (queue) date2026-04-03
Proposed in-service date2030-08-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata