Georgia Power 26-IC-1484 (26-IC-1484)

Georgia Power 26-IC-1484 is a 140.0 MW battery interconnection project in Floyd County, Georgia with a current status of active. It is proposed to connect at Lindale #2 - Portland 115 kV Line.

140.0 MWCapacity
ActiveStatus
GAMarket
BatteryTechnology

Project facts

Canonical nameGeorgia Power 26-IC-1484
Queue ID26-IC-1484
Statusactive
Source statusCluster Study
MarketGA
TechnologyBattery
Capacity140.0 MW
StateGeorgia
CountyFloyd County
Point of interconnectionLindale #2 - Portland 115 kV Line
Requested (queue) date2026-04-03
Proposed in-service date2029-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata