Georgia Power 26-IC-1485 (26-IC-1485)

Georgia Power 26-IC-1485 is a 500.0 MW battery interconnection project in Putnam County, Georgia with a current status of active. It is proposed to connect at Rockville Substation 500 kV Bus.

500.0 MWCapacity
ActiveStatus
GAMarket
BatteryTechnology

Project facts

Canonical nameGeorgia Power 26-IC-1485
Queue ID26-IC-1485
Statusactive
Source statusCluster Study
MarketGA
TechnologyBattery
Capacity500.0 MW
StateGeorgia
CountyPutnam County
Point of interconnectionRockville Substation 500 kV Bus
Requested (queue) date2026-04-03
Proposed in-service date2031-02-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata