Georgia Power GPCQF-1056 (GPCQF-1056)
Georgia Power GPCQF-1056 is a 80.0 MW solar interconnection project in Turner County, Georgia with a current status of withdrawn. It is proposed to connect at North Tifton - Pitts 230 kV Line.
80.0 MWCapacity
WithdrawnStatus
GAMarket
SolarTechnology
Project facts
| Canonical name | Georgia Power GPCQF-1056 |
|---|---|
| Queue ID | GPCQF-1056 |
| Status | withdrawn |
| Source status | GIA Terminated |
| Market | GA |
| Technology | Solar |
| Capacity | 80.0 MW |
| State | Georgia |
| County | Turner County |
| Point of interconnection | North Tifton - Pitts 230 kV Line |
| Requested (queue) date | 2022-08-29 |
| Proposed in-service date | 2026-03-13 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Georgia Power |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata