Georgia Power GPCQF-1056 (GPCQF-1056)

Georgia Power GPCQF-1056 is a 80.0 MW solar interconnection project in Turner County, Georgia with a current status of withdrawn. It is proposed to connect at North Tifton - Pitts 230 kV Line.

80.0 MWCapacity
WithdrawnStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power GPCQF-1056
Queue IDGPCQF-1056
Statuswithdrawn
Source statusGIA Terminated
MarketGA
TechnologySolar
Capacity80.0 MW
StateGeorgia
CountyTurner County
Point of interconnectionNorth Tifton - Pitts 230 kV Line
Requested (queue) date2022-08-29
Proposed in-service date2026-03-13
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata