Georgia Power GPCQF-1284 (GPCQF-1284)

Georgia Power GPCQF-1284 is a 80.0 MW solar interconnection project in Wayne County, Georgia with a current status of active. It is proposed to connect at Jesup - Offerman 115 kV Line.

80.0 MWCapacity
ActiveStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power GPCQF-1284
Queue IDGPCQF-1284
Statusactive
Source statusPhase II Restudy
MarketGA
TechnologySolar
Capacity80.0 MW
StateGeorgia
CountyWayne County
Point of interconnectionJesup - Offerman 115 kV Line
Requested (queue) date2025-02-27
Proposed in-service date2027-11-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata