Georgia Power IC-002 (IC-002)

Georgia Power IC-002 is a 320.0 MW gas interconnection project in Walton County, Georgia with a current status of withdrawn. It is proposed to connect at East Social Circle - Winder 230 kV.

320.0 MWCapacity
WithdrawnStatus
GAMarket
GasTechnology

Project facts

Canonical nameGeorgia Power IC-002
Queue IDIC-002
Statuswithdrawn
Source status
MarketGA
TechnologyGas
Capacity320.0 MW
StateGeorgia
CountyWalton County
Point of interconnectionEast Social Circle - Winder 230 kV
Requested (queue) date
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata