Georgia Power IC-024 (IC-024)

Georgia Power IC-024 is a 320.0 MW gas interconnection project in Floyd County, Georgia with a current status of withdrawn. It is proposed to connect at Inland Plant, Rome, GA (230 kV).

320.0 MWCapacity
WithdrawnStatus
GAMarket
GasTechnology

Project facts

Canonical nameGeorgia Power IC-024
Queue IDIC-024
Statuswithdrawn
Source status
MarketGA
TechnologyGas
Capacity320.0 MW
StateGeorgia
CountyFloyd County
Point of interconnectionInland Plant, Rome, GA (230 kV)
Requested (queue) date
Proposed in-service date
Operational date
Withdrawn date2001-05-24
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.