Georgia Power IC-025 (IC-025)

Georgia Power IC-025 is a 537.0 MW gas interconnection project in Effingham County, Georgia with a current status of withdrawn. It is proposed to connect at Blandford, McIntosh - L'il Ogeechee 230 Lines.

537.0 MWCapacity
WithdrawnStatus
GAMarket
GasTechnology

Project facts

Canonical nameGeorgia Power IC-025
Queue IDIC-025
Statuswithdrawn
Source status
MarketGA
TechnologyGas
Capacity537.0 MW
StateGeorgia
CountyEffingham County
Point of interconnectionBlandford, McIntosh - L'il Ogeechee 230 Lines
Requested (queue) date
Proposed in-service date
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata