Georgia Power IC-052 (IC-052)
Georgia Power IC-052 is a 613.0 MW gas interconnection project in Chatham County, Georgia with a current status of withdrawn. It is proposed to connect at Kraft - Depthord Double Circuit 115 kV Lines.
613.0 MWCapacity
WithdrawnStatus
GAMarket
GasTechnology
Project facts
| Canonical name | Georgia Power IC-052 |
|---|---|
| Queue ID | IC-052 |
| Status | withdrawn |
| Source status | — |
| Market | GA |
| Technology | Gas |
| Capacity | 613.0 MW |
| State | Georgia |
| County | Chatham County |
| Point of interconnection | Kraft - Depthord Double Circuit 115 kV Lines |
| Requested (queue) date | — |
| Proposed in-service date | — |
| Operational date | — |
| Withdrawn date | 2001-01-30 |
| Developer | — |
| Utility / transmission owner | Georgia Power |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata