Georgia Power IC-078 (IC-078)

Georgia Power IC-078 is a 564.0 MW gas interconnection project in Floyd County, Georgia with a current status of withdrawn. It is proposed to connect at Rocky Mountain - Bowen 230 kV Line.

564.0 MWCapacity
WithdrawnStatus
GAMarket
GasTechnology

Project facts

Canonical nameGeorgia Power IC-078
Queue IDIC-078
Statuswithdrawn
Source status
MarketGA
TechnologyGas
Capacity564.0 MW
StateGeorgia
CountyFloyd County
Point of interconnectionRocky Mountain - Bowen 230 kV Line
Requested (queue) date
Proposed in-service date
Operational date
Withdrawn date2002-05-17
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.