Georgia Power IC-106 (IC-106)

Georgia Power IC-106 is a 508.0 MW gas interconnection project in Floyd County, Georgia with a current status of withdrawn. It is proposed to connect at Pinson 230 kV Substation.

508.0 MWCapacity
WithdrawnStatus
GAMarket
GasTechnology

Project facts

Canonical nameGeorgia Power IC-106
Queue IDIC-106
Statuswithdrawn
Source status
MarketGA
TechnologyGas
Capacity508.0 MW
StateGeorgia
CountyFloyd County
Point of interconnectionPinson 230 kV Substation
Requested (queue) date
Proposed in-service date
Operational date
Withdrawn date2001-09-20
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata