Georgia Power IC-1067 (IC-1067)
Georgia Power IC-1067 is a 110.5 MW solar interconnection project in Treutlen County, Georgia with a current status of active. It is proposed to connect at Shaddock Creek - Vidalia 115 kV Line.
110.5 MWCapacity
ActiveStatus
GAMarket
SolarTechnology
Project facts
| Canonical name | Georgia Power IC-1067 |
|---|---|
| Queue ID | IC-1067 |
| Status | active |
| Source status | GIA in Suspension |
| Market | GA |
| Technology | Solar |
| Capacity | 110.5 MW |
| State | Georgia |
| County | Treutlen County |
| Point of interconnection | Shaddock Creek - Vidalia 115 kV Line |
| Requested (queue) date | 2022-09-09 |
| Proposed in-service date | 2026-08-15 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Georgia Power |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28
Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata