Georgia Power IC-1068 is a 124.0 MW solar interconnection project in Emanuel County, Georgia with a current status of active. It is proposed to connect at Vidalia - Wadley Primary (Black) 230 kV Line.

124.0 MWCapacity
ActiveStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power IC-1068
Queue IDIC-1068
Statusactive
Source statusGIA in Suspension
MarketGA
TechnologySolar
Capacity124.0 MW
StateGeorgia
CountyEmanuel County
Point of interconnectionVidalia - Wadley Primary (Black) 230 kV Line
Requested (queue) date2022-09-20
Proposed in-service date2027-07-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.