Georgia Power IC-1084 (IC-1084)

Georgia Power IC-1084 is a 470.0 MW solar interconnection project in Coweta County, Georgia with a current status of withdrawn. It is proposed to connect at Plant Wansley Substation 500 kV Bus.

470.0 MWCapacity
WithdrawnStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power IC-1084
Queue IDIC-1084
Statuswithdrawn
Source statusGIA Terminated
MarketGA
TechnologySolar
Capacity470.0 MW
StateGeorgia
CountyCoweta County
Point of interconnectionPlant Wansley Substation 500 kV Bus
Requested (queue) date2022-10-26
Proposed in-service date2027-06-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata