Georgia Power IC-1100 (IC-1100)
Georgia Power IC-1100 is a 300.0 MW solar interconnection project in Pulaski County, Georgia with a current status of active. It is proposed to connect at Kathleen - Pitts 230 kV Line.
300.0 MWCapacity
ActiveStatus
GAMarket
SolarTechnology
Project facts
| Canonical name | Georgia Power IC-1100 |
|---|---|
| Queue ID | IC-1100 |
| Status | active |
| Source status | GIA in Suspension |
| Market | GA |
| Technology | Solar |
| Capacity | 300.0 MW |
| State | Georgia |
| County | Pulaski County |
| Point of interconnection | Kathleen - Pitts 230 kV Line |
| Requested (queue) date | 2022-11-29 |
| Proposed in-service date | 2026-06-28 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Georgia Power |
Cross-source records
This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | active | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata