Georgia Power IC-1119 (IC-1119)

Georgia Power IC-1119 is a 200.0 MW battery interconnection project in Bartow County, Georgia with a current status of withdrawn. It is proposed to connect at Kingston Substation 230 kV Bus.

200.0 MWCapacity
WithdrawnStatus
GAMarket
BatteryTechnology

Project facts

Canonical nameGeorgia Power IC-1119
Queue IDIC-1119
Statuswithdrawn
Source statusRequest Withdrawn
MarketGA
TechnologyBattery
Capacity200.0 MW
StateGeorgia
CountyBartow County
Point of interconnectionKingston Substation 230 kV Bus
Requested (queue) date2023-02-14
Proposed in-service date2026-09-01
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—withdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-10-12

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata