Georgia Power IC-1142 (IC-1142)

Georgia Power IC-1142 is a 183.0 MW solar interconnection project in Baldwin County, Georgia with a current status of active. It is proposed to connect at Gordon - Milledgeville (White) 115 kV Line.

183.0 MWCapacity
ActiveStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power IC-1142
Queue IDIC-1142
Statusactive
Source statusGIA with NTP
MarketGA
TechnologySolar
Capacity183.0 MW
StateGeorgia
CountyBaldwin County
Point of interconnectionGordon - Milledgeville (White) 115 kV Line
Requested (queue) date2023-05-30
Proposed in-service date2028-05-15
Operational date—
Withdrawn date—
Developer—
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—activehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-11-26

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.