Georgia Power IC-1144 (IC-1144)

Georgia Power IC-1144 is a 260.0 MW battery interconnection project in Bartow County, Georgia with a current status of active. It is proposed to connect at Kingston Substation 230 kV Bus.

260.0 MWCapacity
ActiveStatus
GAMarket
BatteryTechnology

Project facts

Canonical nameGeorgia Power IC-1144
Queue IDIC-1144
Statusactive
Source statusGIA in Suspension
MarketGA
TechnologyBattery
Capacity260.0 MW
StateGeorgia
CountyBartow County
Point of interconnectionKingston Substation 230 kV Bus
Requested (queue) date2023-06-09
Proposed in-service date2028-05-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata