Georgia Power IC-1170 (IC-1170)

Georgia Power IC-1170 is a 500.0 MW battery interconnection project in Douglas County, Georgia with a current status of active. It is proposed to connect at Villa Rica Substation 500 kV Bus.

500.0 MWCapacity
ActiveStatus
GAMarket
BatteryTechnology

Project facts

Canonical nameGeorgia Power IC-1170
Queue IDIC-1170
Statusactive
Source statusGIA in Suspension
MarketGA
TechnologyBattery
Capacity500.0 MW
StateGeorgia
CountyDouglas County
Point of interconnectionVilla Rica Substation 500 kV Bus
Requested (queue) date2023-08-22
Proposed in-service date2030-12-01
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectactivehigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata