Georgia Power IC-1177 (IC-1177)

Georgia Power IC-1177 is a 547.0 MW gas interconnection project in Effingham County, Georgia with a current status of operational. It is proposed to connect at Blandford TS Substation 230 kV Bus.

547.0 MWCapacity
OperationalStatus
GAMarket
GasTechnology

Project facts

Canonical nameGeorgia Power IC-1177
Queue IDIC-1177
Statusoperational
Source statusCommercial Operation
MarketGA
TechnologyGas
Capacity547.0 MW
StateGeorgia
CountyEffingham County
Point of interconnectionBlandford TS Substation 230 kV Bus
Requested (queue) date2023-09-27
Proposed in-service date2024-03-15
Operational date2024-03-15
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectoperationalhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.