Georgia Power IC-119 (IC-119)

Georgia Power IC-119 is a 550.0 MW gas interconnection project in Chatham County, Georgia with a current status of withdrawn. It is proposed to connect at Kraft-McIntosh 230 kV lines.

550.0 MWCapacity
WithdrawnStatus
GAMarket
GasTechnology

Project facts

Canonical nameGeorgia Power IC-119
Queue IDIC-119
Statuswithdrawn
Source status
MarketGA
TechnologyGas
Capacity550.0 MW
StateGeorgia
CountyChatham County
Point of interconnectionKraft-McIntosh 230 kV lines
Requested (queue) date
Proposed in-service date
Operational date
Withdrawn date2002-02-14
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-28

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.