Georgia Power IC-122 (IC-122)

Georgia Power IC-122 is a 858.0 MW gas interconnection project in Effingham County, Georgia with a current status of withdrawn. It is proposed to connect at W. McIntosh - Thalmann 500 kV line.

858.0 MWCapacity
WithdrawnStatus
GAMarket
GasTechnology

Project facts

Canonical nameGeorgia Power IC-122
Queue IDIC-122
Statuswithdrawn
Source status—
MarketGA
TechnologyGas
Capacity858.0 MW
StateGeorgia
CountyEffingham County
Point of interconnectionW. McIntosh - Thalmann 500 kV line
Requested (queue) date—
Proposed in-service date—
Operational date—
Withdrawn date2002-01-25
Developer—
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_project—withdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-10-11

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.