Georgia Power IC-1227 (IC-1227)
Georgia Power IC-1227 is a 150.0 MW solar interconnection project in Elbert County, Georgia with a current status of withdrawn. It is proposed to connect at East Watkinsville - Russell Dam (USA) 230 kV Line.
150.0 MWCapacity
WithdrawnStatus
GAMarket
SolarTechnology
Project facts
| Canonical name | Georgia Power IC-1227 |
|---|---|
| Queue ID | IC-1227 |
| Status | withdrawn |
| Source status | Request Withdrawn |
| Market | GA |
| Technology | Solar |
| Capacity | 150.0 MW |
| State | Georgia |
| County | Elbert County |
| Point of interconnection | East Watkinsville - Russell Dam (USA) 230 kV Line |
| Requested (queue) date | 2024-01-08 |
| Proposed in-service date | 2026-12-03 |
| Operational date | — |
| Withdrawn date | — |
| Developer | — |
| Utility / transmission owner | Georgia Power |
What changed
| Observed | Field | Old value | New value | Materiality |
|---|---|---|---|---|
| 2026-08-04 | new_project | — | withdrawn | high |
Explore related data
Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27
Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.
Follow this project and get an alert when its status, capacity, developer, or schedule changes.
Start tracking with interXdata