Georgia Power IC-1231 (IC-1231)

Georgia Power IC-1231 is a 180.0 MW solar interconnection project in Emanuel County, Georgia with a current status of withdrawn. It is proposed to connect at Vidalia - Wadley Primary (Black) 230 kV Line.

180.0 MWCapacity
WithdrawnStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power IC-1231
Queue IDIC-1231
Statuswithdrawn
Source statusRequest Withdrawn
MarketGA
TechnologySolar
Capacity180.0 MW
StateGeorgia
CountyEmanuel County
Point of interconnectionVidalia - Wadley Primary (Black) 230 kV Line
Requested (queue) date2024-01-08
Proposed in-service date2026-08-12
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata