Georgia Power IC-1237 (IC-1237)

Georgia Power IC-1237 is a 150.0 MW solar interconnection project in Wilcox County, Georgia with a current status of withdrawn. It is proposed to connect at Kathleen - Pitts 230 kV Line.

150.0 MWCapacity
WithdrawnStatus
GAMarket
SolarTechnology

Project facts

Canonical nameGeorgia Power IC-1237
Queue IDIC-1237
Statuswithdrawn
Source statusRequest Withdrawn
MarketGA
TechnologySolar
Capacity150.0 MW
StateGeorgia
CountyWilcox County
Point of interconnectionKathleen - Pitts 230 kV Line
Requested (queue) date2024-01-18
Proposed in-service date2026-07-15
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.