Georgia Power IC-1275 (IC-1275)

Georgia Power IC-1275 is a 200.0 MW battery interconnection project in Mitchell County, Georgia with a current status of withdrawn. It is proposed to connect at North Tifton - Raccoon Creek 500 kV Line.

200.0 MWCapacity
WithdrawnStatus
GAMarket
BatteryTechnology

Project facts

Canonical nameGeorgia Power IC-1275
Queue IDIC-1275
Statuswithdrawn
Source statusRequest Withdrawn
MarketGA
TechnologyBattery
Capacity200.0 MW
StateGeorgia
CountyMitchell County
Point of interconnectionNorth Tifton - Raccoon Creek 500 kV Line
Requested (queue) date2024-03-28
Proposed in-service date2027-09-30
Operational date
Withdrawn date
Developer
Utility / transmission ownerGeorgia Power

Cross-source records

This project is also observed in: Lawrence Berkeley National Laboratory — Queued Up interconnection dataset. interXdata links these source records without double-counting the project.

What changed

ObservedFieldOld valueNew valueMateriality
2026-08-04new_projectwithdrawnhigh

Explore related data

Source last checked2026-08-04
Data last materially changed2026-08-04
Page data generated2026-08-27

Provenance: soco-oatt-queue. Values are normalized from public source records into the interXdata canonical warehouse; see each source for original filings.

Follow this project and get an alert when its status, capacity, developer, or schedule changes.

Start tracking with interXdata